RTD Bridge Work,  July 27-Aug 1, 2005

July 27, 2005


rtd_24   Alignment fixture for hinge


rtd_25  Alignment fixture for hinge     


rtd_26     Arch 2

rtd_27       Arch 2

rtd_28   Arch 2

rtd_29   Arch 2


rtd_30 Arch 2

  

 

Aug 1, 2005


rtd_31 Arch 1 & 2 Sections 0-7.5

rtd_32   Arch 1 in sections, Arch 2 together

rtd_33   Upper hanger rod brackets and lateral braces

rtd_34   Upper hanger rod brackets and lateral braces

rtd_35   Upper hanger rod brackets


rtd_36  Arch 1 & 2 Sections 0-7.5


rtd_37 Arch 1 & 2 Sections 0-7.5

rtd_38  Pins
 

Batu Hijau Project

BendTec Inc.
366 Garfield Ave.
P.O. Box 457
Duluth, Minnesota 55801
Tel: 218 722-0205
Fax: 218 722-6598
 

Simultaneous Welding